proudly presents Spec Ops: The Line (c) 2K Games 27-06-2012....Release Date Protection.............Steam + CEG TFS..............Game Type Disk(s)......................1 DVD RELEASE NOTES Spec Ops: The Line is a new original title from 2K Games that features provocative and gripping Third-Person modern military Shooter gameplay designed to challenge players' morality by putting them in the middle of unspeakable situations where unimaginable choices affecting human life must be made. Features include, a gripping, storyline reminiscent of Apocalypse Now and Heart of Darkness but set in a ruined Dubai, tactical squad-based Delta Force gameplay throughout a horizontally and vertically oriented world, devastating sandstorms which can be used in combat, a variety of multiplayer modes and maps, and deep support featuring two factions.
Customisable, Class-Based, Blazing Multiplayer INSTALL NOTES 1. Unpack the release 2. Mount or burn image 3. Install 4. Copy everything from the SKIDROW folder into the game installation 5. Play the game 6. Support the companies, which software you actually enjoy! ADDITIONAL NOTES Use Launcher.exe, included with the cracked content, for setting the language of your choice. GREETINGS To all friends of the family and honorable rival groups! ascii art by the godlike & terrific duo malodix + irokos titan artdivision
space ops the line crack
2K delivers a gripping shooter with a deep core storyline. While the shooting mechanics are by-the-numbers filler, the story is what will drive you on to the next level. Never has a game struck such an emotional core with the audience and there will be moments when you will question your own decisions as you progress through the game.
1) Download Steam-Fix2) Copy the content of this crack to your game folder3) Start Steam , go to your profile.4) Run the game through SpecOpsTheLine.exe, which is located in the folder with the game \ Binaries \ Win32..5) In-game -> Connection : Accept an invitation from a friendCreating a server : Co-op -> Steamworks -> Closed collaborative game -> Start co-op -> Invite friends! -> invite friends and look forward to their connection.6) Play & Enjoy !
Lugo is the unit's comedic relief. His sordid sense of humor and constant barrage of wise-cracks often cause him to butt heads with his superiors. Regardless of his derogatory quips, his excellent marksmanship more than make up for his lack of social graces. With a Scout Tactical sniper rifle, Lugo is the perfect long-distance killer in tough firefights. Lugo is also fluent in several different lanuages, including Farsi.
Capitalizing on two powerful trends right now, convenience and fresh foods, Kraft Heinz appears poised to be a disruptor in the breakfast space. By selling its newest product next to the eggs section, the food giant further reinforces the product's fresh positioning and makes the breakfast scramble appear less processed.
The Code of Federal Regulations (CFR) is the official legal print publication containing the codification of the general and permanent rules published in the Federal Register by the departments and agencies of the Federal Government. The Electronic Code of Federal Regulations (eCFR) is a continuously updated online version of the CFR. It is not an official legal edition of the CFR.
Operators of transportation pipelines on the Outer Continental Shelf (as defined in the Outer Continental Shelf Lands Act; 43 U.S.C. 1331) must identify on all their respective pipelines the specific points at which operating responsibility transfers to a producing operator. For those instances in which the transfer points are not identifiable by a durable marking, each operator will have until September 15, 1998 to identify the transfer points. If it is not practicable to durably mark a transfer point and the transfer point is located above water, the operator must depict the transfer point on a schematic located near the transfer point. If a transfer point is located subsea, then the operator must identify the transfer point on a schematic which must be maintained at the nearest upstream facility and provided to PHMSA upon request. For those cases in which adjoining operators have not agreed on a transfer point by September 15, 1998 the Regional Director and the MMS Regional Supervisor will make a joint determination of the transfer point.
For a new or existing pipeline segment to be eligible for operation at the alternative maximum allowable operating pressure (MAOP) calculated under 192.620, a segment must meet the following additional design requirements. Records for alternative MAOP must be maintained, for the useful life of the pipeline, demonstrating compliance with these requirements:
This subpart prescribes minimum requirements for the design and installation of pipeline components and facilities. In addition, it prescribes requirements relating to protection against accidental overpressuring.
Each welded branch connection made to pipe in the form of a single connection, or in a header or manifold as a series of connections, must be designed to ensure that the strength of the pipeline system is not reduced, taking into account the stresses in the remaining pipe wall due to the opening in the pipe or header, the shear stresses produced by the pressure acting on the area of the branch opening, and any external loadings due to thermal movement, weight, and vibration.
Each pipeline must be designed with enough flexibility to prevent thermal expansion or contraction from causing excessive stresses in the pipe or components, excessive bending or unusual loads at joints, or undesirable forces or moments at points of connection to equipment, or at anchorage or guide points.
For a new or existing pipeline segment to be eligible for operation at the alternative maximum allowable operating pressure calculated under 192.620, a segment must meet the following additional construction requirements. Records must be maintained, for the useful life of the pipeline, demonstrating compliance with these requirements:
The corrosion control procedures required by 192.605(b)(2), including those for the design, installation, operation, and maintenance of cathodic protection systems, must be carried out by, or under the direction of, a person qualified in pipeline corrosion control methods.
Whenever an operator has knowledge that any portion of a buried pipeline is exposed, the exposed portion must be examined for evidence of external corrosion if the pipe is bare, or if the coating is deteriorated. If external corrosion requiring remedial action under 192.483 through 192.489 is found, the operator shall investigate circumferentially and longitudinally beyond the exposed portion (by visual examination, indirect method, or both) to determine whether additional corrosion requiring remedial action exists in the vicinity of the exposed portion.
Each pipeline under cathodic protection required by this subpart must have sufficient test stations or other contact points for electrical measurement to determine the adequacy of cathodic protection.
Each operator that uses direct assessment as defined in 192.903 on an onshore transmission line made primarily of steel or iron to evaluate the effects of a threat in the first column must carry out the direct assessment according to the standard listed in the second column. These standards do not apply to methods associated with direct assessment, such as close interval surveys, voltage gradient surveys, or examination of exposed pipelines, when used separately from the direct assessment process.
When conducting in-line inspections of pipelines required by this part, an operator must comply with API STD 1163, ANSI/ASNT ILI-PQ, and NACE SP0102, (incorporated by reference, see 192.7). Assessments may be conducted using tethered or remotely controlled tools, not explicitly discussed in NACE SP0102, provided they comply with those sections of NACE SP0102 that are applicable.
Except for service lines and plastic pipelines, each segment of a pipeline that is to be operated at a hoop stress less than 30 percent of SMYS and at or above 100 p.s.i. (689 kPa) gage must be tested in accordance with the following:
Whenever an increase in population density indicates a change in class location for a segment of an existing steel pipeline operating at hoop stress that is more than 40 percent of SMYS, or indicates that the hoop stress corresponding to the established maximum allowable operating pressure for a segment of existing pipeline is not commensurate with the present class location, the operator shall immediately make a study to determine: 2ff7e9595c